Building Process

Consultation and Designing

Building the dream home is one of life’s most memorable and challenging experiences. Global Constructions team works closely with you at every step and makes sure that you get the house you have always dream of. We make the whole process as informative and stress-free as possible. Our design & selection team works closely with you and gives you plenty of time to focus on what is important – making your home the way you want it. We offer a complete range of services from land divisions, financial assistance and turnkey products.

Engineering

Designing is a very crucial stage of every foundation. We listen to your family’s requirements and ask you to provide the land dimensions. Based on the provided information and local Council’s guidelines, we give you the initial concept plan and then organise another meeting with you and amend the plans to meet your family’s requirements.

After receiving an initial deposit, we organise the soil testing and preliminary footing report.

Pre-Construction Phase

Step 1 – Selection

We organise the selection with you. Our selection process is much better than other project builders. We make sure that you have a wider range of selection and you make your selection in the Kitchen Showroom, Appliances /Sanitary and Tiling Warehouse. The rest of the detailed selection you complete with our staff. We can provide you with the extensive Electrical selection with Clipsal and clients can have a modern way of living style – C Bus Channels at additional cost.

Step 2 - Working drawings and 6 Star Energy rating certificate

The Global Constructions Team would mark up the plan and send it to the designer for the final planning approval and DA approvals. Your responsibility is to double-check with our staff and make sure that you understand what is on the plan and ask any question you have regarding your dream house.

Step 3 - Approval Process

Global Constructions would lodge the planning consent application with Council and Private Certifiers for DA.

Step 4 - Bank Pack

Global Constructions will prepare your bank pack documents for finance approvals like working drawings, site plans, footing & Civil Plan, Variation if any along with interim statement and send scanned copies to your bank.

Step 5 - Finance approvals

Global Constructions ask you to provide evidence of land ownership and finance approvals.

Step 6 - Ready to start building

Global Constructions prepares the construction file and orders the materials for your home. You will be introduced to a building supervisor who would be your contact person. Our supervisors are very flexible and keep you updated on the building process and take you onsite with pre-arranged appointments and make sure that you enjoy each step of building your dream home or investment property.

On-Site Phase

Step 1 - Foundation

Global Constructions site supervisors organise the subcontractors who clear the site, prepare the base, dig the site, fix the steel and pour the concrete under the supervision of our engineer. All underground services then get laid.

Step 2 - Framework

Global Constructions qualified subcontractors first fixing carpenters erect the frame & roof trusses and give you the first view of your home. Our site supervisor walks through with you and makes sure that you get the framework up as per your understanding of the working drawing.

Step 3 - Lockup

After the Brickwork and roof are completed the house reaches the lockup stage. The first fixing of electrical, plumbing and heating cooling for two storeys is completed at this stage. Our site supervisors walk through with you at this stage and make sure that you get everything as per your understanding. If anything is missing, we can incorporate your requirements at an additional cost.

Step 4 - Internal linings and insulation

Internal linings and insulation of the ceiling and the walls is completed and the plasterboard is installed. Global Constructions supervisor organises a site meeting with you if you require the designing of niches and bulkhead to be done for your home.

Step 5 - Second fixing

Internal doors, Staircase, Kitchen & Vanities are installed (Excluding stone benchtop and Glass Splashback).

Step 6 - Practical completion

Tiling, Paint, 2nd fixing electrical & plumbing (except HWS & Cooktop) BIR if applicable, Bathroom fixtures, Heating cooling system are installed. Global Constructions supervisors organise the pre-handover inspection with you and list all the outstanding items if any. We complete the house as per the contract and after receiving the final progress payment, we hand over the keys along with home warranties and certificates of compliance at our office.

Maintenance & Warranty

After you move into your home, we ask you to send us a list of things (if any) to be fixed after the completion of 3 months. Global Constructions aftercare team organises the maintenance inspection and sends trades for maintenance.